Contents: Removal ↓ Installation ↓
Caution: The sealing ring of the nipple connector may be damaged if the locking bracket is in the locked position during installation. This will result in a leak. Follow the installation instructions.
Removal
Fig. 2.352. Fixing bracket.
The nipple connector can be unlocked by pulling the locking clip (fig. 2.352).
The hose/tube should be disconnected without any additional means.
Installation
When replacing the sealing ring, insert it into the groove of the boost air hose. Make sure that the ring is completely seated in the groove.
Lubricate the sealing lips and O-ring with oil.
Fig. 2.353. Locking and unlocking positions of the retaining bracket
Move the locking bracket to the unlock position 1 (fig. 2.353).
Press the boost air supply hose into the coupling until it stops.
Move the locking bracket to the locking position 2 and press the hose again, finally (fig. 2.353).
By pulling, check the correct fit and secure fixation of the hose in the coupling.
Hose connections with spring clamps
Fig. 2.354. Spring clamp
Note: After removing and installing the booster air tubes with spring clamps, there is a high probability of the hose "slipping off" while driving. For this reason, spring clamps are installed, which are then allowed to be opened if the corresponding booster air tube is faulty (fig. 2.354).
In case of repair, the spring clamp must be broken using a suitable tool and replaced with a new one.
Fig. 2.355. Turbocharger components: 1 – seal; 2 – to the bypass cover; 3 – bolt 25 Nm; 4 – connecting tube; 5 – bracket; 6 – bolt 10 Nm; 7 – oil supply line; 8 – union nut, 22 Nm; 9 – union nut, 22 Nm; 10 – connecting nipple, 30 Nm; 11 – sealing ring; 12 – seal; 13 – turbocharger; 14 – support; 15 – bolt 40 Nm; 16 – oil supply pipe; 17 – connecting nipple, 40 Nm; 18 – bolt 20 Nm; 19 – bolt 20 Nm4 20 – protective screen; 21 – bolt 20 Nm
(The information is posted on this website: «vwmanual.ru»)
Note: All hose connections must be secured. The supercharging system must be airtight. Self-locking nuts must be replaced.
Note: Before tightening the oil feed line, fill the turbocharger connection nipple with engine oil.
Note: To ensure lubrication of the turbocharger, after installing the turbocharger, let the engine run at idle speed for approximately 1 minute.

Visitor comments