Pic. 292. Secondary shaft: 1, 9 - retaining rings; 2, 4 - spring washers; 3 - bearing; 5 - adjusting lining; 6 - gear 1 gear; 7, 13 - needle bearings; 8, 11 - synchronizer rings; 10 - synchronizer I / II transmission; 12 - gear 2nd gear; 14 - third gear gear; 15 - gear IV gear; 16 - secondary shaft; 17 - bearing; 18 - synchronizer spring; 19 - bushing; 20 - the hub of the synchronizer of I / II gears; 21 - synchronizer cracker
From the shaft, slide the gear 6 of the first gear, the needle bearing 7, the synchronizer ring 8 and the washer.
Remove the retaining ring from the synchronizer hub (see by analogy fig. 291). Take out a shaft from a nave of the synchronizer 10 I/II transfers (see fig. 292), as well as gear 12 II gear. To do this, use two-arm pullers (pic. 293 and 294).
Put the plate under the 14th gear of the 3rd gear, remove the shaft from the 15th gear of the 4th gear.
Visitor comments