Poly V-belt location on models without air conditioning
Location of the V-ribbed belt on models with an air conditioning system
Order of execution
1. If the belt will be reinstalled using a marker or paint, mark the direction of rotation with an arrow.
2. Loosen the poly V-belt tension. To do this, turn the V-ribbed belt tensioner clockwise with a wrench.
3. In this position of the tension roller, with a mandrel or a drill shank with a diameter of 4.5 mm and a length of 55 mm, fix the poly V-belt tensioning mechanism.
4. Remove poly V-belt.
Visitor comments