Instructions: Remove the plastic pads protecting the open valves immediately before installing the cylinder head. When replacing the cylinder head, you should also drain the old and fill in new coolant.
- 1 - Cylinder head, after replacement, change all coolant
- 2 - Washer of a bolt of a head of the block of cylinders
- 3 - Cylinder head bolt, observe the sequence when loosening and tightening, insert washers into the cylinder head before installing
- 4 - 25 Nm
- 5 - Hanging eye
- 6 - Gasket, replace
- 7 - Vacuum pump
- 8 - 10 Nm
- 9 - Branch pipe of the cooling system
- 10 - 10 Nm
- 11 - Gasket, replace
- 12 - 25 Nm
- 13 - Hanging eye
- 14 - Cylinder head gasket, replace. Install in accordance with the marking, after replacement, change all coolant
- 15 - Hall sender -G40- for camshaft position
- 16 - 10 Nm
Checking the cylinder head for warping
Max. permissible curvature: 0.1 mm. Instruction: Grinding the cylinder head of diesel engines is not allowed.
Cylinder head gasket marking
- Part Number = Arrow 1
- Holes = arrow 2
- Control Code = Arrow 3 (do not mention it)
Note: The thickness of the cylinder head gasket to be installed depends on the protrusion of the pistons. When replacing a gasket, only install a gasket with the same marking. When installing new pistons or a short block, it is necessary to determine the protrusion of the pistons at TDC.
Visitor comments