ASY diesel engine with a displacement of 1.9 liters and a power of 47 kW (64 hp)
1 - cylinder head gasket
Always replace. After replacement, change all coolant. Gaskets are available in various thicknesses. Always install a gasket with the same marking as the removed gasket. If necessary, check piston protrusion.
2 - bolt, 20 Nm
3 - cylinder head
After replacement, change all coolant. The maximum allowable flatness is 0.1 mm. The surface cannot be refinished.
4 - eye
5 - bolt, 8 Nm
For engine cover.
6 — a bolt of fastening of a head of cylinders
Always replace the bolt with a new one. Release sequence: 10 to 1.
Tighten the cylinder head bolts in 4 steps.
The tightening sequence in each reception: from 1 to 10.
Tightening instructions:
Reception 1: 40 Nm.
Reception 2: 60 Nm.
Technique 3: Turn 90° (¼ turn) in the direction of tightening.
Technique 4: Turn 90° (¼ turn) in the direction of tightening.
7 - oil deflector
8 - cylinder head cover
With vulcanized seal. If the seal is damaged, the cylinder head cover must be replaced.
9 - sealing cuff
Replace if damaged.
10 - cover
Replace seal if damaged.
11 — a tube of system of ventilation
12 - collar
13 - pressure control valve
For the crankcase ventilation system.
14 - seal
Replace if damaged.
15 - bolt, 10 Nm
16 - high pressure fuel lines, 25 Nm
Remove using the HAZET 4560 ring wrench. Remove the pipelines as a whole, do not change the shape of the bends.
17 - bracket
For engine cover.
18 - bolt, 20 Nm
19 - vacuum pump
For brake booster.
20 - bolt, 20 Nm
21 - sealing gasket
Always replace.
Visitor comments