Removing
Drain the coolant.
Note: Gaskets and O-rings must be replaced.
Remove poly V-belt.
Remove the toothed belt.
Pic. 2.189. Water pump components
Unscrew the fixing bolts 1 of the water pump 2 and remove the water pump (pic. 2.189).
Installation
Installation is carried out in the reverse order, taking into account the following.
Lubricate the new O-ring 3 with coolant.
Establish the water pump 2 in the block of cylinders and tighten fixing bolts 1 with the moment of 15 Нм.
Note: Coolant pump plug points down.
Install the toothed belt.
Install poly V-belt.
Fill with coolant.
Visitor comments