Note: Removal, installation and performance testing of the fuel pump is carried out in the same way as described in the system "Mono-Jetronic".
The productivity should be, cm³/30 s at the terminal voltage:
- 8 B: 175-195;
- 9 V: 290-310;
- 10V: 390-410;
- 11 B: 515-535;
- 12V: 640-660.

Visitor comments