Instructions: Fix all hose connections with clamps corresponding to those installed at the factory. Degrease hose connections and charge system hoses before installation. Only for nipple connections, lightly lubricate the O-ring and seating surface with oil. The boost system must be airtight.
- 1 - Intercooler
- 2 - 5 Nm
- 3 - Support for intercooler
- 4 - O-ring, replace if damaged
- 5 - Charge air hose
- 6 - Intake manifold pipe with lip seal
- 7 - Air damper unit -J338-. When replacing, delete adaptation parameters and relearn engine control unit -J623-
- 8 - 7 Nm
- 9 - Hose clamp
- 10 - Charge air hose
- 11 - 10 Nm
- 12 - Charge air pipe
- 13 - Charge pressure sender -G31- with intake air temperature sender 2 -G299-
- 14 - 5 Nm
- 15 - Charge air supply hose to turbocharger
- 16 - Charge air pipe
- 17 - Charge air hose
Visitor comments