Water entering the sliding roof cutout flows down the drains located in its front and rear slopes.
The front drain can be cleaned from above with compressed air or flexible steel wire after the roof is folded.
Rear drain can be cleaned from below after trim removal (in the same way).
In the case of installing a new drain, care should be taken not to form a bend. New drains are pulled in and glued with universal adhesive.
Visitor comments