Attach the injector to the jig with a manometer to check the injection pressure.
By slowly moving the device pump handle down, create a pressure on the pressure gauge of about 150 kgf / cm2 and, holding the handle in the lower position for 10 s, make sure that there is no seepage of fuel through the nozzle spray.
Visitor comments