1. Switch B (see figure Ventilation and heating controls) put it on step 2 or 3.
2. If necessary, move handle A to the air heating zone.
3. Put the handle C on
4. Close nozzles 3.
5. Through nozzles 4, additional warm air can be directed to the side windows.

Visitor comments