Contents: Condition ↓ Work execution procedure ↓
Condition
The exhaust system must cool down.
Work execution procedure
Move the entire exhaust system in direction of travel 1 and tighten the double clamps until dimension a is reached on the fastening elements (fig. 2.299).

Average muffler: size a=10 mm.
Rear muffler: size a=15 mm.

Visitor comments