Removal of pipelines
1. Clean the injection lines at the injection pump fittings with a cold cleaner.
2. Unscrew the cap nuts with an open spanner, e.g. HAZET 4560.
Attention! Do not change the curved shape of the pipelines.
3. Tighten the connecting fittings to 45 Nm.
4. Tighten injection lines to 25 Nm. If sealing is not achieved in this way, install a new connecting fitting (3) and a new o-ring (1).
Attention! Do not confuse the pressure valves (2) together.
Visitor comments