English
Русский
Български
Беларускі
Український
Српски
Hrvatski
Română
Polski
Slovenský
Magyar
|
Articles
|
Sitemap
|
Contacts
|
Search
|
Main
Passat
Golf
Polo
Touareg
Tiguan
Sharan
Transporter
Others
LT 28
(1975-1991)
LT 2D
(1996-2003)
Beetle
(1960-1986)
Caddy 3
(2003-2010)
Wheel bearing runout adjustment
(VW Lt 2d)
Main
Volkswagen
LT 2D
Transmission
Manual gearbox
Wheel bearing runout adjustment
0
1. Install the indicator on the hub with a preload of 2 mm and set the indicator pointer to "0" (figure 6.5).
Figure 6.5. Install the indicator on the hub.
2. Measure the wheel bearing runout by moving the hub back and forth.
3. Adjust the runout within 0.02-0.04 mm by rotating the fastening nut.
This article is available at
russian
,
bulgarian
,
belarusian
,
ukrainian
,
serbian
,
croatian
,
romanian
,
polish
,
slovak
,
hungarian
The text has been checked:
Kolesnikov Artem
Share information:
Previous articles
Removal and installation the power take-off (PTO) valve
Flange, drive shafts and PTO engagement mechanism
Removal and installation a manual transmission with a power take-off (PTO)
Power take-off box
Disassembling and assembling the reverse gear shaft
Disassembly and assembly of the intermediate shaft
Next articles
Similar articles from other manuals for VW cars:
Removal and installation the rear wheel hub bearing
Passat B3 (1988-1993)
Front wheel alignment adjustment
Golf 1 (1974-1984, petrol)
Steering wheel height adjustment
Polo 3 (1995-2003)
Minimizing wheel runout
Touareg 1 (2002-2006)
Wheel hub bearing unit parts and components
Tiguan 1 (2007-2015)
Knock sensor. Knock adjustment
Sharan 1 (1995-2000)
Basic rear wheel brake adjustment
Transporter T4 (1990-2003)
Link to this page in different formats
HTML
Text
BB Code
Volkswagen Volkswagen 1996-2003: Wheel bearing runout adjustment
- article on website about car repair Volkswagen www.VWmanual.ru
Article about car repair Volkswagen Volkswagen 1996-2003: Wheel bearing runout adjustment https://www.vwmanual.ru/en/rest/lt-2d/transmission/gearbox/regulirovka-bieniya-podshipnika-kolesa
[url=https://www.vwmanual.ru/en/rest/lt-2d/transmission/gearbox/regulirovka-bieniya-podshipnika-kolesa]Volkswagen Volkswagen 1996-2003: Wheel bearing runout adjustment[/url] - article on website about car repair Volkswagen www.VWmanual.ru
Visitor comments
No comments yet
How much will 18 + 39 =
Caddy 3
General information
User manual
Daily care
Maintenance
Petrol engines 1.4 l
Engine repair
Cooling and lubrication system
Power and exhaust system
Petrol engines 1.6 l
Engine repair
Cooling and lubrication system
Power and exhaust system
Diesel engines
Engine repair
Cooling and lubrication system
Power and exhaust system
Transmission
Mechanical gearbox 0AH
Mechanical gearbox 0A4
Drive shafts
Chassis
Car suspension
Steering
Brake system
Body and wiring diagrams
Interior and exterior
Electrical circuits
Beetle
General information
Maintenance
Power unit
Engine repair
Cooling and lubrication system
Supply system
Exhaust system
Transmission
Clutch
Car gearbox
Chassis
Front suspension
Rear suspension
Steering
Brake system
Wheels and tires
Body
Exterior
Electrical equipment
Equipment and devices
Power devices
Electrical circuits
LT 2D
General information
User manual
Maintenance
Power unit
Petrol engines 2.3 l
Diesel engines 2.5 l
Diesel engines 2.8 l
Injection system (diesel 2.8 l)
Transmission
Clutch
Manual gearbox
Differential
Chassis
Car suspension
Steering system
Brake system
Body
Body elements
Heating system
Electrical equipment
Equipment and devices
Electrical circuits
LT 28
General information
Maintenance
Power unit
Petrol engines 2.0L
Petrol engines 2.4L
Diesel engines
Cooling and heating
Fuel and exhaust system
Ignition system
Transmission
Clutch
Car gearbox
Cardan shaft
Rear axle
Chassis
Brake system
Car suspension
Steering system
Body
Body elements
Doors, locks and windows
Electrical equipment
Power devices
Equipment and devices
Electrical circuits
Our website uses cookies to ensure functionality and convenience.
Accepted
Visitor comments