English Русский
Български
Беларускі
Український
Српски
Hrvatski
Română
Polski
Slovenský
Magyar
  |  Articles  |  Sitemap  |  Contacts  |    |
Car maintenance Ford Car maintenance Hyundai Car maintenance Chevrolet Car maintenance BMW Car maintenance Audi Car maintenance Opel Car maintenance AvtoVAZ
VWmanual.ru
 
 
 
 
 
 
 
 
Main   Passat   Golf   Polo   Touareg   Tiguan   Sharan   Transporter   Others  
LT 28 (1975-1991) LT 2D (1996-2003) Beetle (1960-1986) Caddy 3 (2003-2010)

Disassembly and assembly of the clutch with the synchronizer hub of 1st and 2nd gears (VW Caddy 3)

  • Main
  • Volkswagen
  • Caddy 3
  • Transmission
  • Mechanical gearbox 0A4
  • Disassembly and assembly of the clutch with the synchronizer hub of 1st and 2nd gears
            0


The flanges on both sides of the synchronizer hub are the same width. But on one side the flange has an internal chamfer (arrow B).

After assembly, the hub flange with the chamfer and the end of the coupling with the external toothed ring (arrow A) should be on the same side of the synchronizer.

The grooves for the crackers in the hub and coupling (arrow C) must be located opposite each other.

The grooves for the crackers in the hub and coupling (arrow C) must be located opposite each other.


Assembling the clutch with the synchronizer hub for 1st and 2nd gears if the crackers have notches



The synchronizer sleeve is placed on the hub.

Insert crackers and install springs with an offset of 120° relative to each other. Insert the bent end of the spring into the recess of one of the crackers.

Insert crackers and install springs with an offset of 120° relative to each other. Insert the bent…


Assembling the clutch with the synchronizer hub for 1st and 2nd gears in the case of conventional crackers



The synchronizer sleeve is placed on the hub.



Insert crackers and install springs with an offset of 120° relative to each other. In this case, the bent ends of the springs (arrows) should be located behind the crackers.

Insert crackers and install springs with an offset of 120° relative to each other. In this case,…


Mounting position of the 1st and 2nd gear synchronizer clutch and hub



The coupling is installed with the toothed ring (arrow) to the splined ring of the shaft (A) for the hub of the synchronizer of 3rd and 4th gears.

The coupling is installed with the toothed ring (arrow) to the splined ring of the shaft (A) for…

This article is available at russian, bulgarian, belarusian, ukrainian, serbian, croatian, romanian, polish, slovak, hungarian
The text has been checked: Kolesnikov Artem

Share information:

Previous articles
Position of the inner, intermediate and blocking ring of the 1st gear synchronizer
Disassembly and assembly of the secondary shaft
Disassembling and assembling the gearshift mechanism
Adjusting the gear shift mechanism
Removal and installation the gear shift mechanism
Checking the operation of the gear shift mechanism
Next articles
Pressing on the clutch and hub of the synchronizer for 1st and 2nd gears
Disassembly and assembly of the clutch with the synchronizer hub of 3rd and 4th gears


Similar articles from other manuals for VW cars:
Clutch device Passat B3 (1988-1993)
Clutch and manual transmission data Golf 1 (1974-1984, petrol)
Clutch drive Polo 3 (1995-2003)
Clutch pedal assembly Tiguan 1 (2007-2015)
Clutch — design description Sharan 1 (1995-2000)
Clutch — design description Transporter T4 (1990-2003)
Link to this page in different formats


Visitor comments


No comments yet


How much will 42 + 25 =

       



Caddy 3 
  • General information
  • User manual
  • Daily care
  • Maintenance
  • Petrol engines 1.4 l
  • Engine repair
  • Cooling and lubrication system
  • Power and exhaust system
  • Petrol engines 1.6 l
  • Engine repair
  • Cooling and lubrication system
  • Power and exhaust system
  • Diesel engines
  • Engine repair
  • Cooling and lubrication system
  • Power and exhaust system
  • Transmission
  • Mechanical gearbox 0AH
  • Mechanical gearbox 0A4
  • Drive shafts
  • Chassis
  • Car suspension
  • Steering
  • Brake system
  • Body and wiring diagrams
  • Interior and exterior
  • Electrical circuits
Beetle 
  • General information
  • Maintenance
  • Power unit
  • Engine repair
  • Cooling and lubrication system
  • Supply system
  • Exhaust system
  • Transmission
  • Clutch
  • Car gearbox
  • Chassis
  • Front suspension
  • Rear suspension
  • Steering
  • Brake system
  • Wheels and tires
  • Body
  • Exterior
  • Electrical equipment
  • Equipment and devices
  • Power devices
  • Electrical circuits
LT 2D 
  • General information
  • User manual
  • Maintenance
  • Power unit
  • Petrol engines 2.3 l
  • Diesel engines 2.5 l
  • Diesel engines 2.8 l
  • Injection system (diesel 2.8 l)
  • Transmission
  • Clutch
  • Manual gearbox
  • Differential
  • Chassis
  • Car suspension
  • Steering system
  • Brake system
  • Body
  • Body elements
  • Heating system
  • Electrical equipment
  • Equipment and devices
  • Electrical circuits
LT 28 
  • General information
  • Maintenance
  • Power unit
  • Petrol engines 2.0L
  • Petrol engines 2.4L
  • Diesel engines
  • Cooling and heating
  • Fuel and exhaust system
  • Ignition system
  • Transmission
  • Clutch
  • Car gearbox
  • Cardan shaft
  • Rear axle
  • Chassis
  • Brake system
  • Car suspension
  • Steering system
  • Body
  • Body elements
  • Doors, locks and windows
  • Electrical equipment
  • Power devices
  • Equipment and devices
  • Electrical circuits
VWmanual.ru © 2016-2026 | Mobile version | News and articles | Sitemap: EN BG BY UA RS HR RO PL SK HU | Write message | Site search
Passat B2 • Passat B3 • Passat B4 • Passat B5 • Passat B6 • Golf 1, diesel • Golf 1, petrol • Golf 2, petrol • Golf 2 • Golf 3 • Golf 4 • Golf 5 • Polo 3 • Polo 4 • Touareg 1 • Tiguan 1 • Sharan 1 • Transporter T3 • Transporter T4 • LT 28 • LT 2D • Beetle • Caddy 3 •
Our website uses cookies to ensure functionality and convenience.