List of parts and assemblies with notes on installation work for Figure VC2.198:
1. Throttle body (J338):
- heated by coolant.
2. Sealing ring:
- replace with a new one during assembly.
3. Direction to the heater heat exchanger.
4. Cooling system distributor.
5. O-ring:
- replace with a new one during assembly.
6. Coolant temperature sensor (G62).
7. Fixing bracket.
8. Direction towards the top of the radiator.
9. Coolant manifold mounting screw: 10 Nm.
10. Cooling system pipe.
11. Tube bracket fastening screw: 40 Nm.
12. Direction to the expansion tank.
13. O-ring:
- replace with a new one during assembly.
14. Direction to the upper radiator hose.
15. Direction to the bottom of the radiator.
16. Thermostat pipe fastening screw: 15 Nm.
17. Fitting.
18. O-ring:
- replace with a new one during assembly.
19-Thermostat:
- examination:
- by heating in a vessel with water;
- start of opening: approximately 87°C;
- fully open: approximately 102°C;
- valve lift height: not less than 7 mm.
20. Coolant - oil heat exchanger.
21. Sealing ring:
- replace with a new one during assembly.
22. Coolant pump
23. Sealing ring:
- replace with a new one during assembly.
24. Vapor lock removal pipe.
25. Pipe mounting screw: 10 Nm.
26. Pipe mounting screw: 10 Nm.
(The original article is available at: vwmanual.ru)

Visitor comments